Vertex Learn

Mathematical methods: 7 problems solved step by step

What this lesson covers

  • A real problem has to be turned into mathematical questions before any method can be chosen.
  • Methods from different strands of mathematics can work on the same problem.
  • In relational thinking the result of one process becomes the input to the next.
  • A connected chain is only as good as its weakest step, so every link must be correct.
  • Every model rests on assumptions, and changing one can change the answer.
  • Extending a problem means asking what happens in general, or what the model cannot tell you.
Key idea

7 problems, one hāngī

  • A kapa haka fundraiser at the marae.
  • Each problem: a different method.
  • Write the assumption and its limit.
  • Excellence: connect two methods.
Your turn

Question 1 · Achieved

  • Last year, 80 meals used 30 kg of meat.
  • How much meat for 120 meals?
  • State your assumption.
Worked example

Q1: meat for 120 meals

  • Method: a rate.
  • One meal first.
  1. 30 ÷ 80 = 0.375 kg per mealrate
  2. 0.375 × 120 = 45 kgscale up
  3. 120 ÷ 80 = 1.5, 30 × 1.5 = 45
  4. Assume: same portion per meal
  5. Limit: appetites and waste vary
  6. Order about 45 kg of meat
Your turn

Question 2 · Achieved

  • Meat costs $12 per kg.
  • Orders of 40 kg or more: 20% off.
  • Find the cost of 45 kg, and
  • The meat cost per meal (120 meals).
Worked example

Q2: the cost of the meat

  • Method: a percentage.
  • 45 kg ≥ 40 kg: discount.
  1. 45 × $12 = $540full price
  2. 0.2 × $540 = $10820% of $540
  3. $540 − $108 = $432take it off
  4. 0.8 × $540 = $432pay 80%
  5. $432 ÷ 120 = $3.60 a meal
  6. Assume: price holds till the day
  7. Limit: prices can change
  8. Meat $432, or $3.60 a meal
Your turn

Question 3 · Merit

  • Other food: $2.40 a meal.
  • Fixed costs: $200. Meals sell at $15.
  • Write the profit P for n meals.
  • Find P for 120 meals.
Worked example

Q3: a profit model

  • Method: a linear model.
  • Profit = income − costs.
  1. food = 3.60 + 2.40 = $6 a meal
  2. income = 15n
  3. costs = 6n + 200
  4. P = 15n − (6n + 200)income − costs
  5. P = 9n − 200collect like terms
  6. 9 × 120 − 200 = $880n = 120
  7. Assume: every meal is sold
  8. Limit: unsold meals still cost
  9. Profit $880 from 120 meals
Key idea

Try it: cost against income

Your turn

Question 4 · Merit

  • The trip needs $1000 of profit.
  • Using P = 9n − 200, how many
  • Meals must they sell?
  • Careful with the rounding.
Worked example

Q4: meals for $1000

  • Method: an equation.
  • Round up, then check.
  1. 9n − 200 = 1000P = 1000
  2. 9n = 1200+200 both sides
  3. n = 1200 ÷ 9 = 133.3…÷ 9
  4. 9 × 133 − 200 = 997133 meals: $3 short
  5. 9 × 134 − 200 = 1006134 meals: target met
  6. Assume: every meal is sold
  7. Limit: 134 buyers, not 120
  8. Sell at least 134 meals
Your turn

Question 5 · Merit, in context

  • The pit is a cuboid: 1.5 m long,
  • 1.2 m wide and 0.8 m deep.
  • A wheelbarrow holds 0.09 m³.
  • How many barrow loads of soil?
Worked example

Q5: digging the pit

  • Method: volume.
  • Then divide by a load.
  1. V = l × w × dcuboid
  2. V = 1.5 × 1.2 × 0.8
  3. = 1.44 m³
  4. 1.44 ÷ 0.09 = 16 loadsbarrow holds 0.09 m³
  5. 16 × 0.09 = 1.44
  6. Assume: straight sides, flat floor
  7. Limit: dug soil swells
  8. About 16 barrow loads of soil
Key idea

Try it: digging the pit

Your turn

Question 6 · Excellence

  • Dug soil takes up 25% more space.
  • How many barrow loads now?
  • Evaluate your answer to question 5.
Worked example

Q6: soil that swells

  • Volume, then a percentage.
  • Then judge question 5.
  1. 1.44 × 1.25 = 1.8 m³+25%
  2. 1.8 ÷ 0.09 = 20 loads
  3. 16 × 1.25 = 2025% more loads
  4. 16 loadsignored the swelling
  5. Assume: 25% suits this soil
  6. Limit: sloped sides hold less
  7. Plan for about 20 barrow loads
Your turn

Question 7 · Excellence

  • They cook 140 meals, but only 85% sell.
  • Do they still make $1000 profit?
  • Evaluate the model P = 9n − 200.
Worked example

Q7: cooked is not sold

  • Percentage, then the model.
  • Costs: cooked. Income: sold.
  1. sold = 0.85 × 140 = 119
  2. income = 119 × $15 = $1785
  3. costs = 6 × 140 + 200 = $1040
  4. profit = $1785 − $1040 = $745
  5. $1000 − $745 = $255 short
  6. P = 9n − 200treats cooked as sold
  7. Assume: exactly 85% sell
  8. Better: pre-sell, cook to order
  9. No: $745 profit, $255 short
Key idea

Try it: follow the change

Common mistakes

  • 20% off 45 kg: 0.2 × $540 = $108, so the meat costs $108.
    $108 is the discount; the cost is $540 − $108 = $432, or 0.8 × $540.
  • 9n = 1200, n = 133.3, so they need to sell 133 meals.
    Round up: 133 meals give 9 × 133 − 200 = $997, $3 short, so they must sell at least 134.
  • 119 meals sold, so profit = 9 × 119 − 200 = $871.
    Costs come from all 140 meals cooked: $1785 income − $1040 costs = $745, which is $255 short of $1000.
  • About 45 kg of meat. (no assumption given)
    State the assumption, the same portion per meal, and its limit, since appetites and waste vary; Merit and Excellence look for it.
Summary

The methods that solved all seven

  • Choose, connect, state the assumption, then evaluate.
StepHow
Ratefind one meal, then scale up
Percent20% off means pay 80%
Modelprofit = income − costs
Equationsolve, round up, then check
Volumel × w × d, then divide
Connectone answer feeds the next
Evaluateassumption, limit, better plan

Challenge

1

The hāngī team needs 0.375 kg of meat per meal. Meat costs $12 per kg, but an order of 40 kg or more gets 20% off the whole order. For some numbers of meals it is cheaper to order a full 40 kg than to order only the meat they need. For which numbers of meals is that true?

Hint

Work out what 40 kg costs with the discount. Then find how many kilograms at full price cost the same. Turn that back into meals.

Answer

From 86 to 106 meals: order 40 kg instead

Step by step
  1. 40 kg with 20% off costs 0.8 × 40 × $12 = $384.
  2. At full price, $384 buys 384 ÷ 12 = 32 kg. Any order over 32 kg (and under 40 kg) costs more than $384.
  3. 32 kg feeds 32 ÷ 0.375 = 85.3 meals, so from 86 meals the meat needed costs more than $384.
  4. From 107 meals they need over 40 kg anyway, so the discount already applies.
  5. So for 86 to 106 meals, ordering exactly 40 kg is cheaper.
Full working
  1. 0.8 × 40 × 12 = $38440 kg with the discount
  2. 384 ÷ 12 = 32 kgfull-price kilograms for $384
  3. 32 ÷ 0.375 = 85.3… mealsthe break-even point
  4. 86 × 0.375 = 32.25 kg, 32.25 × 12 = $387 > $38486 meals: 40 kg is cheaper
  5. 85 × 0.375 = 31.875 kg, 31.875 × 12 = $382.50 < $38485 meals: buy what you need
  6. 106 × 0.375 = 39.75 kg, 107 × 0.375 = 40.125 kgfrom 107 meals the discount applies anyway
  7. 86 to 106 meals: order 40 kg
2

The fundraiser cooks 140 meals, but only 85% sell. Food costs $6 per meal cooked and fixed costs are $200. What is the lowest price per meal, to the cent, that still gives at least $1000 profit? Then give one reason this price might not work.

Hint

Costs come from every meal cooked, income only from meals sold. Write income − costs ≥ 1000 and solve for the price. Think about rounding money.

Answer

$17.15 per meal; but a higher price may mean fewer than 85% sell

Step by step
  1. Meals sold: 85% of 140 = 119.
  2. Costs are for all 140 cooked: 6 × 140 + 200 = $1040.
  3. Profit = 119p − 1040, and this must be at least $1000, so 119p ≥ 2040.
  4. p ≥ 2040 ÷ 119 = 17.142…, and $17.14 is a little short, so round up to $17.15.
  5. Limit: the 85% came from a $15 price; raising the price could mean fewer people buy.
Full working
  1. sold = 0.85 × 140 = 119 mealsincome only from sold meals
  2. costs = 6 × 140 + 200 = $1040costs from cooked meals
  3. 119p − 1040 ≥ 1000profit at least $1000
  4. 119p ≥ 2040, p ≥ 2040 ÷ 119 = 17.142…solve
  5. 119 × 17.14 = $2039.66$0.34 short
  6. 119 × 17.15 = $2040.85target met
  7. Lowest price $17.15 per meal (assumes 85% still sell)
3

At $15 a meal the team expects to sell 140 meals. Their survey says every $1 rise in price loses 10 buyers. They cook only to order, so costs are $6 per meal sold plus $200 fixed. Which whole-dollar price gives the most profit, and what is that profit? Explain which price you would recommend.

Hint

Write the number sold and the profit per meal for each price: $15, $16, $17 and so on. A table is a fine method. Look carefully at the top of the table.

Answer

$17 and $18 both give the most profit, $1120; recommend $18 (same profit, 10 fewer meals to cook)

Step by step
  1. At price p, meals sold = 140 − 10(p − 15), and each meal makes p − 6 dollars.
  2. Profit = (p − 6) × meals sold − 200.
  3. A table from $15 to $20 gives $1060, $1100, $1120, $1120, $1100, $1060.
  4. The profit peaks at $1120 for both $17 and $18.
  5. $18 gives the same money from 110 meals instead of 120, so less work, less food and less risk.
  6. Limit: the '10 fewer per $1' rule is only an estimate, and food costs might change with fewer meals.
Full working
  1. meals = 140 − 10(p − 15)10 buyers lost per $1
  2. P = (p − 6) × meals − 200profit per meal × meals − fixed
  3. $15: 9 × 140 − 200 = $1060start
  4. $16: 10 × 130 − 200 = $1100up
  5. $17: 11 × 120 − 200 = $1120peak
  6. $18: 12 × 110 − 200 = $1120peak again
  7. $19: 13 × 100 − 200 = $1100falling
  8. Best: $17 or $18, profit $1120; choose $18, as it needs only 110 meals

More challenge problems

Worksheet with answersWithout answersDownload PDF
Report a mistake

More in AS 91945

Is your child on track?

Take the free placement test